Permits to Work
8 of 8 permits
| Permit | Type | Contractor | Risk | Valid | Status |
|---|---|---|---|---|---|
| PTW-2026-1041Welding on 24" mainline tie-inStation A – Valve Yard 3 | Hot Work | PetroWeld Contracting | Critical | 2026-08-29 → 2026-08-30 | Active |
| PTW-2026-1042Trench excavation for pipeline crossingKP 142 – Road Crossing | Excavation | Desert Falcon Construction | High | 2026-08-30 → 2026-09-02 | Pending |
| PTW-2026-1043Valve chamber internal inspectionStation B – Chamber V-12 | Confined Space | Gulf Pipeline Services | Critical | 2026-08-29 → 2026-08-29 | Approved |
| PTW-2026-1044Scaffold work on pipe rack PR-7Station A – Pipe Rack 7 | Work at Height | Gulf Pipeline Services | High | 2026-08-28 → 2026-08-30 | Active |
| PTW-2026-1045Crane lift of 12t pipe spoolFabrication Yard – Bay 2 | Lifting | Atlas Heavy Lift Co. | High | 2026-08-31 → 2026-08-31 | Draft |
| PTW-2026-1046HT cable termination at substationSubstation SS-2 | Electrical | Horizon Electromechanical | High | 2026-08-30 → 2026-09-01 | Pending |
| PTW-2026-1047Bolt torquing on flange F-88Station C – Manifold | Cold Work | Gulf Pipeline Services | Medium | 2026-08-26 → 2026-08-27 | Expired |
| PTW-2026-1048Grinding near coating yardCoating Yard – South | Hot Work | PetroWeld Contracting | Medium | 2026-08-25 → 2026-08-26 | Closed |